S16E14 The Acton House - 14
- Sezonul 16, episodul 14
- •
- Difuzat duminică, 15 mai 1994
At in-ground propane tank is installed for cooking and drying. Inside, the wallbaord is up, plaster is going on the ceiling, and Tom Silva demonstrates a new vacuum sander for finishing off the taped seams on the drywall. Richard Trethewey installs a flexible stainless oil-burner flue liner in the chimney, which will prevent flue gases from considering and damaging the mortar and bricks. our master carpenter uses a new jig to drill out holes for the rear exterior door's lock set. Sima visits a tile store to pick out a slate tile, and the Ferrante brothers use a diamond wet saw to cut it before installing it in the mudroom, laundry room and half bath.
Intră în cont
Salvează ce ai văzut, ce vrei să vezi și ce ți-a plăcut. E gratuit.
Confirmă-ți emailul
Ca să-ți salvezi titlurile, confirmă mai întâi adresa de email. Ți-am trimis un link la înregistrare.
Retrimite linkul